The project for the development and withdrawal to the design production capacity of the Oshedkino deposit, including the development of quarries, exploration, the construction of a gold recycling with a processing capacity of 1 million tons of ore per year, the construction of the tailing, infrastructure and auxiliary buildings, and structures, acquisition and installationProduction and mining equipment