A modern platform in the territory of advanced special economic zone "Zabaikalie" with a full range of engineering and road infrastructure for the development of your business.
Post a project
The purpose of the creation of the park is the placement of industrial enterprises in an organized area with engineering infrastructure facilities and the necessary administrative and legal conditions.
The task of creating the park is the formation of effective mechanisms for the development of the industrial sector and related areas of the regional economy, as well as increasing the investment attractiveness of the Transbaikal region.
The strategic goal of creating an industrial park is import substitution. For the region, an important task is to increase the volume of building materials producing, which in turn will affect the reduction in the cost of building one square meter of housing in the Transbaikal region.
Design estimates, geodetic and geological surveys are being carried out. Specifications for technological connection to power supply networks have been received.
The start of construction of the first stage is planned for 2023.
FEATURES:
The park is distinguished by its location within the city, among the advantages of transport accessibility, namely:
17 km – to the center of Chita,
19 km - the distance from the airport "Kadala",
18 km - to the nearest freight railway station "Kadala",
1,5 km - to the federal highway Baikal (Р 258)
Video surveillance will be installed at the site
Exhibition areas will be available to tenants
An active recreation area will be equipped
The land plot is located within the boundaries of the ASEZ "Zabaikalie".
Residents will have the opportunity to quickly obtain the status of a ASEZ resident, which gives tax and administrative preferences
Other preferences:
Preferential rental of premises
Reduced cost of electricity
For the implementation of the first stage of the project in 2023, four land plots with a total area of 14 hectares have been identified - in the area of Ivanovsky passage in the Chernovsky district of Chita. The basis there will be three large modular buildings with a total area of about 35-40 thousand square meters - like hangars, where future residents of the industrial park will be able to place production lines, immediately receiving the necessary communications in the form of water, electricity, heat.
Industrial infrastructure 42000 m2:
1. industrial buildings 36142 m2;
2. administrative building 6216.06 m2: - dormitory rooms 593.1 m2; - office premises - 491.48 m2; - common areas - 1906.83 m2; - technical premises - 1598.97 m2; exhibition area - 512.9 m2; - canteen and staff room - 1112.78 m2
3. engineering infrastructure 2000 m2;
1) Power supply networks - 15 MW;
2) Water supply networks - 300 m3/day;
3) Water disposal networks - 200 m3/day;
4) Heat supply - 8.1 Gcal/hour;
5) Internal road - 62855 m2.
In the area of Ivanovsky street, on the territory where the production of building materials of OOO Mir has already been accumulated. For a long time, a cluster has been formed there, which is successfully operating and will now be supplemented by manufacturers of other building materials.